Skip to content

Feature • Earthwork

AI earthwork takeoff & cut/fill in minutes

Turn CAD and vector PDF civil plan sets into accurate 3D terrain models and cut/fill balance sheets in minutes — not days. Automated contour detection, DTM, stripping, subsidence, and strata adjustments with bridge-ready accuracy.

Key Features

Automated contour detection & DTM

Reads existing and proposed contours, spot elevations, breaklines → builds 3D digital terrain model without manual digitizing.

Stripping, subsidence & strata layers

Adjust topsoil stripping depth, rock strata, over-excavation. Real-time BCY vs loose vs compacted conversions.

Structural excavation & trench takeoff

Utility trenches, footing excavations, retaining walls — quantities push directly to heavy civil assemblies.

Evidence-backed balance sheets

Every cubic yard traces to sheet, contour interval, and DTM log — auditable cut/fill reports for owners.

Interactive Tool

Try the cut & fill calculator

High-intent estimators stay to test volumes — BCY, CCY, LCY, stripping, haul cost. For full DTM automation, see the standalone tools page.

BidSync AI — Earthwork Cut & Fill Estimator

Calculate bank cubic yards (BCY), compacted fill (CCY), and net volume balancing.

Raw Cut Volume (BCY)
0 BCY
Compacted Fill (CCY)
0 CCY
Net Earthwork Balance
0 BCY

Need 3D Contour & DTM Earthwork Extraction?

Let BidSync AI automatically extract quantities directly from PDF civil plan sets.

Try BidSync AI Free →

Formula: (Area × Depth) ÷ 27 = CY • Stripping added to cut • Net = Cut BCY − Fill CCY • LCY = BCY × swell. For bid-ready DTM, see Earthwork Takeoff.

How BidSync AI Handles 3D Earthwork Takeoffs

Upload vector PDF/DWG → automated contour detection builds 3D DTM → adjust stripping/subsidence/strata → output BCY/CCY balance sheet to bid items. Handles 100+ sheets via Cloudflare Edge rendering.

How to calculate cut and fill volumes automatically?

DTM built from plans, auto-adjusted for stripping/compaction, exports BCY/CCY balance to bid.

What is BCY vs CCY?

BCY = bank (in-situ), CCY = after compaction. BidSync converts with shrinkage factors per soils report.

Balance earthwork before the pre-bid

Request Early Access